The plan is usually the bottleneck
First article inspection proves a process can make the part to the drawing. Before anyone measures, someone has to build the plan: every characteristic, every tolerance, every instrument. When that takes hours per drawing, the first part waits for the paperwork.
Check, read, plan, approve
- Check. Upload several drawings at once. Files with no dimensions, no tolerance block or a revision mismatch are held, with the reason.
- Read. Every view, section and sheet is read in minutes. Anything uncertain goes on a review list.
- Plan. Tolerances, limits, your tools, GD&T and notes, by the ASME Y14.5 rulebook. Change any line, then export Excel or PDF.
- Approve. One click sends it to the quality manager, who approves it or sends it back with a reason.
Built for the audit
Every drawing lands in history, searchable and downloadable again, and every step sits on one audit trail: who, when and why.